Were you on the lookout for selective information around A Step-by-Step Guide to Installing a Bathtub?

Mounting a bath tub isn't exactly rocket science, but it does require solid plumbing, carpentry, and occasionally, tiling abilities. Replacing an old bathtub with a brand-new one is also a moderately tough project. If the old tub is readily available, the job can move quickly; if you need to open up a wall to get rid of the old tub and position the brand-new tub, the job is much harder. In either situation, the job is within a house handyman's abilities, although you will certainly need a helper to move out the old bathtub and also embeded in the new one. See to it you have certified yourself for the work as well as fit trying it. Instead of working with a contractor to take control of a halfway-completed task, it is far better to take into consideration employing one prior to you start. Opportunities are you might need an expert plumber to make tube links.
This article will certainly assist you mount a brand-new bath tub in your restroom if you have actually already purchased a new tub and do not need to change the arrangement of your previous water system pipes.
Your devices as well as product list need to comprise the following:
Planning for the Installment
To start with, the sustaining frame supplied with the bath must be fitted (if needed) according to the manufacturer's directions. Next, fit the taps or mixer to the bath tub. When suitable the tap block, it is important to make certain that if the tap includes a plastic washing machine, it is fitted between the bathroom as well as the taps. On a plastic bathroom, it is additionally sensible to fit a supporting plate under the taps system to prevent pressure on the bathtub.
Fit the versatile faucet adapters to the bottom of the two faucets utilizing 2 nuts and olives (sometimes provided with the tub). Fit the plug-hole outlet by smearing mastic filler round the sink outlet opening, and then pass the outlet via the hole in the bath. Use the nut provided by the maker to fit the plug-hole. Examine the plug-hole electrical outlet for an inlet on the side for the overflow pipe.
Next, fit completion of the versatile overflow pipeline to the overflow outlet. Afterwards, screw the pipeline to the overflow face which must be fitted inside the bath. Ensure you use every one of the provided washers.
Attach the catch to the bottom of the waste outlet on the tub by winding the thread of the waste outlet with silicone mastic or PTFE tape, and also screw on the trap to the outlet. Attach the bottom of the overflow tube in a similar manner.The bathroom should now prepare to be suited its last position.
Removing Old Taps
If you require to change old taps with new ones as a part of your setup, after that the first thing you need to do is separate the supply of water. After doing so, switch on the taps to drain any type of water continuing to be in the system. The procedure of getting rid of the existing faucets can be quite troublesome due to the restricted gain access to that is usually the instance.
Make use of a container wrench (crowsfoot spanner) or a faucet tool to undo the nut that connects the supply pipelines to the taps. Have a cloth all set for the continuing to be water that will certainly come from the pipes. Once the supply pipelines have been gotten rid of, utilize the same device to loosen the nut that holds the faucets onto the bath/basin. You will need to quit the single faucets from turning throughout this process. When the taps have been eliminated, the holes in the bath/basin will certainly have to be cleansed of any old securing substance.
Before going on to fit the new faucets, compare the pipe links on the old faucets to the new taps. If the old faucets are longer than the brand-new taps, after that a shank adapter is needed for the brand-new taps to fit.
Installing the Tub
Making use of both wood boards under its feet, put the tub in the called for placement. The wood boards are practical in evenly spreading out the weight of the tub over the area of the boards as opposed to concentrating all the weight onto 4 small points.
The next objective is to make certain that the bath tub is leveled all round. This can be achieved by checking the spirit level and also readjusting the feet on the tub until the level checks out level.
To install faucets, fit the bottom of the furthest adaptable tap port to the suitable supply pipeline by making a compression sign up with; then do the very same for the various other tap.
Turn on the water as well as check all joints as well as new pipework for leakages and also tighten them if needed. Fill the bath tub and additionally check the overflow electrical outlet and the typical electrical outlet for leaks.
Lastly, repair the bathroom paneling as defined in the producer's user's manual. Tiling and sealing around the tub needs to wait till the tub has actually been made use of at least once as this will settle it right into its last position.
Suitable New Taps
If the tails of the new taps are plastic, then you will need a plastic port to avoid damage to the string. One end of the adapter fits on the plastic tail of the tap and the other end offers a connection to the current supply pipelines.
If you require to fit a monobloc, after that you will certainly require decreasing couplers, which links the 10mm pipeline of the monobloc to the basic 15mm supply pipe.
Next, place the tap in the placing opening in the bath/basin guaranteeing that the washing machines remain in location between the tap as well as the sink. Secure the faucet in place with the supplier given backnut. Once the faucet is securely in position, the supply pipes can be attached to the tails of the taps. The taps can either be attached by using corrugated copper piping or with typical tap ports. The former kind ought to be linked to the faucet ends first, tightening up only by hand. The supply pipes can later be connected to the other end. Tighten up both ends with a spanner after both ends have actually been connected.
Tiling Around the Tub
In the area where the bathroom meets the tile, it is required to secure the accompanies a silicone rubber caulking. This is very important as the installation can relocate sufficient to crack a stiff seal, causing the water to pass through the wall in between the bathroom as well as the tiling, causing issues with wetness as well as feasible leaks to the ceiling below.
You can pick from a selection of coloured sealants to blend in your components as well as fittings. They are marketed in tubes and cartridges, and can sealing voids as much as a size of 3mm (1/8 inch). If you have a bigger space to fill, you can load it with spins of soaked newspaper or soft rope. Keep in mind to always load the tub with water before securing, to allow for the motion experienced when the tub is in usage. The sealer can split fairly early if you do not take into consideration this activity prior to sealing.
Additionally, ceramic coving or quadrant floor tiles can be used to edge the bathroom or shower tray. Plastic strips of coving, which are easy to use and reduce to size, are also quickly available on the market. It is recommended to fit the floor tiles utilizing waterproof or water-proof glue and also grout.
How to Install or Replace a Bathtub
Find Your Dimensions
The first step in any bathtub installation or replacement is to select the right size tub for your bathroom. Start by measuring your existing bathtub’s alcove from wall to wall. The standard size for bathtubs is around 5 feet long and 30 or 32 inches wide. Purchase the size that’s closest to your previous tub.
After you’ve measured, you’ll need to figure out what type of tub you need. Face the alcove. If the drain is on the right-hand side, you’ll need a right drain tub. If it’s on the left, get a left drain tub. Easy enough, right?
Disconnect the Water Supply and Drain Assembly
Before you can start on your removal, make sure that you turn off the tub’s water supply. Some bathrooms have a shutoff valve, but if you don’t see one, you’ll need to turn off the supply at your house’s water main. Once the water’s off, open the valves to release any remaining air in the supply lines.
Then, disconnect the tub drain flange. This process varies based on the type of drain you have, but in most cases, you’ll need a drain flange removal tool to perform this task. If you’re feeling handy, you might be able to use a pair of needle-nose pliers to twist and pull the flange.
Now comes the fun part. In order to disconnect the drain assembly, you’ll need to be able to get to the space underneath the tub. You might need to access the tub drain from a crawlspace or a basement. Don’t forget to take a pipe wrench with you, as you’ll need it to loosen the pipe at the connection.
Cut Out the Old Tub
After removing the drainpipe assembly, you can take out the old bathtub. Cut a strip above the tub edge in the wall surrounding the bathtub that's about 6 inches in height. The tools you need here may vary depending on the type of wall surround you have in the alcove. If you’re cutting drywall, use a drywall saw and remove the section of the wall all the way down to the studs. If you have tile, you’ll need to use a grinder with a diamond blade to cut through the grout line. Then, use a chisel to remove the individual tiles. Take care here not to cut through any studs.
Find the tub flange. Remove the screws that attach the flange to the studs in the wall. At this point, the tub should be freed from the wall.
Once you’ve removed the flange, use a utility knife to cut away the caulk between the tub and the floor. When this is done, you should be able to lift the tub up and out of the alcove. Keep in mind that, depending on what it’s made of, the old tub could be tremendously heavy. You should plan to have a friend help you move it just in case.
Install the New Tub
Before you make any adjustments to the area, place the new tub in the alcove to make sure it fits properly and that the tub drain lines up with the P-trap underneath the floor.
Remove it and install a 2 x 4 ledger board. Measure the tub’s flange, then mark that height on the wall. Screw the ledger board to studs in the wall. This will help to support the weight of the tub.
Once the ledger board has been installed, go ahead and secure the drain to the tub. For this step, you’ll need some plumber’s putty. Roll a small amount of putty in your hands and wrap it around the underside of the drain flange. Push the drain into the tub from underneath the tub.
When the drain has been attached, connect the overflow drain. To do this, you’ll place the gasket on the overflow elbow and move it behind the tub. Once that’s on, connect the overflow pipe and the drainpipe, but take care not to overtighten.
Secure the Tub
After the connections are in, it’s time to set the tub in place. Before you start, make sure the flange lines up with the markings you made in Step 4. Because the ledger board holds the tub in place, it’s important that it matches up. If not, you’ll need to remove it and readjust.
Once your measurements line up, attach the flange to the studs on all three sides of the wall. Please note that you should not screw the flange to the wall. Instead, you should use roofing nails because they won’t rust over time. When the tub is in place, install the baseboard and the molding in front of and around the tub.
Repair and finish off the drywall or tile that you cut in Step 3. If you’re installing a fiberglass bath surround, now’s the time to adhere it to the alcove.
Then, enjoy your tub! While all these steps might seem intimidating, removing and installing a new bathtub is a relatively easy DIY project that can be completed in a single day. And now, when you settle in for your next bubbly soak, you can enjoy your bath without the distraction of a tub in disrepair.